|
|
2002 10Gbps Ethernet
|
| -News- |
| |
| セ璸礶κ货じび呼隔╰参垂砞璸璸礶Θ狦伦河篴莉垂╰参瓣產м璸礶 程ㄎ砞璸贱 |
| |
| -Introduction- |
| |
| As the demands for the bandwidth of LAN and MAN raises rapidly (50-200 times for every 7 years), the bandwidth of LAN has increased from 10/100 Mb/s to the next generation, 1Gb/s, and would soon enter the era of Projectsb/s. Moreover, the LAN of Projectsb/s would be determined by Ethernet, because of the mature infrastructure of it. Since Ethernet takes "low cost" as its main concern, in the latest standard of IEEE 802.3ae ver3.3 ProjectsBase-LX4 plays an important role in next generation's Ethernet. Therefore the purpose of this project is to provide the circuit design and system analysis for the key components in the hundred-billion-dollar Ethernet System. |
This project includes five sub-projects:
Sub-project 1: The modeling of transmission and the design of system architecture for Projectsbps Ethernet
Sub-project 2: The design of the transmitter for Projectsbps Ethernet
Sub-project 3: The design of the receiver for Projectsbps Ethernet
Sub-project 4: Gigabit analog signal processor
Sub-project 5: Digital baseband circuit design for high-speed optical communication |
| This project is scheduled to finish in 3 years, where for the 1st and 2nd year we focus on the executions of subjects, and for the 3rd year we integrate the results of subprojects into a system. Specially, in the 1st year, we study standards and the method to define limiting budgets. Then we start system design and simulation, establish the model of 1.3-um laser multi-module fiber transmission channel, and study the technique for high frequency circuits. In the 2nd year we would start circuit simulations and layouts and implement the circuit with processes that CIC provide. Besides we might establish the model of 1.3um laser single-module fiber transmission channel, and purchase commercialized IC to compose the ProjectsBase-LX4 fiber system. In the 3rd year we optimize every circuit and component in sub-projects and measure implemented ICs. At last we discuss the possibility for system integration, provide components for Projectsbps series transmission VECSEL CD and the channel models established, and discuss more about the possibilities if realizing Projectsbps series transmission systems. |
| | |
|